The SYCM7 PV Box Transformer , supplied by China manufacturer Zhejiang Soutya New Energy LLC, is a prefabricated step-down substation commonly deployed in utility-scale ground-mount, large C&I rooftop or agrivoltaic PV plants rated 1 MW and above.
▶ Configuration: a step-down transformer, HV RMU, LV breaker, four-remote RTU, temperature controller and surge arresters.
The SYCM7 PV Box Transformer, supplied by China manufacturer Zhejiang Soutya New Energy LLC, is a factory-built, 10 kV/0.8 kV step-down substation constructed from corrosion-resistant, UV-stable steel plate and IP54-rated sealing for decades of outdoor service. Inside the enclosure a high-efficiency oil-immersed transformer sits between a gas-insulated HV RMU (load-break switch + fuse protection) and a withdrawable LV breaker (ACB 630 A–1600 A), while a four-remote RTU delivers telemetry, tele-control, tele-metering and tele-signal to the utility SCADA. An intelligent temperature controller continuously monitors winding and oil temperature, triggering fan banks or trip commands when limits are exceeded, and Class C surge arresters on both HV and LV sides guard against lightning-induced transients. Engineered for 1 MW-plus ground-mount, large C&I rooftop or agrivoltaic PV parks, the skid-mounted unit provides complete medium-voltage reception, step-down transformation and low-voltage protection without requiring onsite civil works or separate control rooms.
Application scenarios
1.Utility-Scale Solar Parks
Dropped onto a cast-in concrete pad, the skid-mounted SYCM7 takes 10 kV from the collector lines and drops it to 0.8 kV for the inverter yard—one box, one bolt-down, grid-code ready.
2.Large C&I Rooftop Arrays
Parked at the roof edge, the slim tank accepts 10 kV utility service, steps it down to inverter voltage and builds MV/LV protection inside—no extra substation room required.
3.Agrivoltaic & Greenhouse Sites
IP54 steel shell and silicone-sealed doors shrug off ammonia, dust and daily wash-downs; the internal thermostat keeps oil cool under reflective film and humid grow-house air.
4.Solar-to-EV Charging Hubs
Planted between PV field and charger plaza, it feeds 0.8 kV straight to the dispenser switchboards; dual-side surge arresters tame transients from every plug-in and plug-out.
5.Modular 1 MW Blocks
Factory-fitted RMU, LV breaker and RTU roll in on a single skid—EPCs bolt, connect and energise within hours, cutting civil works and repeat-building costs to the bone.
East of No.148, Wei 12th Road, Economic Development
Zone,Yanpan Subdistrict,Yueqing City,Wenzhou,Zhejiang
Province,China
For inquiries about DC Combiner Box, Charging Pile, Circuit Breaker or price list, please leave your email to us and we will be in touch within 24 hours.
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies.
Privacy Policy